Monday, 2 September 2013

Saturday, 25 May 2013

Fantastic day, TP03 transported up to the club and assembled for the first time. Went realy well only two issues. Had to move one fitting on the mast and the seating platform is very slippy, should get him on the water in a couple of weeks.
See http://youtu.be/BtOH5Ga6rvM for all the details.

Sunday, 19 May 2013

All ready 6 days to go
Less than one week to go for the transport to SDSC of TP03 - the shoulder is getting a lot better and hoping to transport TP03 - next week end, 25th May. There is a large pile of stuff in the garage which in my mind is a very beautiful boat, I may be unique in this opinion. 


I have now built a simple model  of my lug rig with adjustable CE, I am very impressed with this rig I think it may well have some real potential. It offers a very clean sail, low CE and steering. Only suitable for small proas like my minimal proa though. 
For discussion see  http://proafile.com/forums/viewthread/244/

for some video see http://www.youtube.com/watch?v=JyE0FsI_GAQ



Saturday, 18 May 2013

The minimal proa continues to be my favourite new design, just the bare bones of a proa offering quick simple sailing hopefully along the lines of an international canoe but much easier to sail.
For discussion see http://proafile.com/forums/viewthread/239/


While working on the minimal proa proa I briefly got diverted to the idea of a inflatable version but after working out the details it just became complex without any great advantage.
For discussion see http://proafile.com/forums/viewthread/239/


This is the Strangford Lough Cruiser, it is a combination of a Bank’s Dory, Caddo Lake Bateau and off course a proa.

The brief is for a singlehander or two up for a day sail or a single hander for ultralight camping. The overall length is 14ft, due to building limitations. That’s where the Dory mid ships section comes in. With a 260kg displacement the hull draft is 120mm and L:B 11:1 up the displacement to 360kg and draft 200mm, L:B 10:1. I would have liked a finer hull but the draft increased too much, the bows are sharp giving fine entry. The Bateau influence is twisting the sides of the flat bottom v mid section into vertical stem maximising length and L:B. This twist creates some good flair for reserve buoyancy and keeping the crew dry.

Back to the Dory mid ships section, the flat of the bottom is 200mm, the gunwale 500mm above and a beam of 800mm. This gives space inside for a temporary birth of ‘bivi’ camping, a simple ‘tent’ protecting against the elements.

The beams in the picture are 1600mm apart so some ‘accommodation’ would be under the beams and deck. The ‘birth’ is removable like a camp bed made of material under tension

For discussion with like minded proa people see http://proafile.com/forums/viewthread/259/#1954



Sunday, 24 March 2013

Friday, 15 March 2013


Cad model of minimal proa, two different wave piercing bows, tortured ply near, glass on foam in the distance. Liking this as a development

Friday, 8 March 2013


Cutting a long story short as the family skied in the glorious Courchevel I sat for nearly a week nursing a broken collar bone. While they had fun I did the usual, pondered Proas. The above is a cruising proa and the earlier one is a minimal proa. The real upset is that last weekend I should have been launching the proa TP03 which was all ready to go but now delayed until the shoulder fixes.

Thursday, 7 March 2013


Minimal Proa
I have been working on my minimal proa while my shoulder heals which delayed the launch of TP03

Description, specification
Minimal Proa with balanced lug rig and moving leeboard to align CE with CLR. Single central AKA, nod to Skip Johnson's AC/DC and Bionic Broomstick.
This is a concept for a possible next build after testing my current proa TP03 and will help clarify tests and developments to be done with TP03. The other concept I am interested in is a slightly bigger design with more freeboard and a small central open concept. This will allow two crew and storage of camping gear. All other aspects and hence development tests for this concept as per here.

Main hull
•  LOA 12ft hull, (3.7m) beam and draft 240mm, depth of hull 360mm, freeboard 120mm
•  L/B 15.25
•  Target weight whole craft 50kg, tough target, but research and a few calculation have given me confidence
•  Main hull displacement 150 kg total hull buoyancy 250kg, little reserve but think about  Hobie 16, trimaran floats, swath, Tepuke etc
•  Deck section at bows, addition of foam and glass to create wave piercing bow. This should counter low freeboard and crew fixed in the middle
Outrigger AMA
•  Outrigger buoyancy 50kg allows for crew at 50% beam
•  LOA 2.6m (8.5ft) beam 160mm
•  L/B 16.25
Overall beam tbc approx 1.5 to 1.8m
Construction,
•  ply, simple box
•  plywood and polyurethane foam bulkheads.
•  All hull panels 3mm Okoume
AKA
•  3mm egg box constructed 'box' based on International Canoe sliding seat.
•  Hydrodynamic box shape lifts AKA 250mm above deck, as a result underside of AKA  370mm above static waterline. This reinforced box also contains a deep 'bury' for the mast and links righting forces with heeling forces without loading the hull. Leeboard loads are relatively close. The only other load being the buoyancy which is obviously spread throughout the hull. This all helps to produce a light structure.

AKA to AMA connection
•  Two flexible beams allow movement of AMA relative to main hull
Rig
•  balanced lug,
•  unstayed mast,
•  area 8m sq
Steering and lateral resistance,
•  leeboard mounted on track moves fore and aft to steer by achieving CE / CLR balance

Why's  and downsides
•  Proa (Pacific)
•  Max performance for given materials, performance means many different things, in this case it is reasonable speed in a minimal package
•  Downside, control issues, additional complexity?
•  Minimal
•  Low freeboard, very light weight,
•  Less materials
•  Cost
•  Weight
•  Less room to build
•  Easy to transport, fastest way to get upwind is behind / on / in a car
•  Easy to handle on land
•  Downside low freeboard drag,
•  Downside low buoyancy limits use; single handed daysail
•  Lug rig
•  Good performance for simple set up and small spars
•  Lower hull stress
•  Less set up time
•  Low CE
•  Heeling
•  Pitching
•  Downside ultimate performance
•  Free standing mast
•  Lower stress
•  Stress all in one place
•  Less set up time
•  One central AKA, also the seat
•  Simple
•  Stress in one place as above
•  Away from bow so possibly less drag from wave action
•  Less set up time
•  One item two uses
•  Downside can't trim fore and aft
•  Downside limits to one user
•  Steering with moving leeboard
•  One foil only
•  Low drag
•  Downside unproven, test with 2b
•  Sharpie (box construction)
•  Very simple build
•  Flat plate, ply, construction
•  Max buoyancy for box size
•  Helps leeboard system
•  Bow sections promote lift
•  Latest AC, A Class appear to have flatter sections
•  Downside higher weight and wetted area for buoyancy

Sunday, 23 September 2012

Couple of quick sketches of where the design could go. A development of the current design. Lug rig with moving leeboards. Beam wide like international canoe sliding seat. The colourful one is minimalistic strip planked wave piercing hull. The B&W one wider dory hull with attached outrigger, more a laid back touring / expedition boat.

Back at work so not much movement on the proa, the mast partners are made and bolted on, new leeboard slider made, two new hatch holes cut.

Other news - the number 57 sail - see earlier has now been turned into a 'storm sail' for the RS vision and was used to great effect last Saturday. Slow controlled up wind work and a wet sleigh ride down wind with the asymmetric.




Thursday, 30 August 2012



Have been visiting my folks and found two pictures of my first proa. The pictures are taken at the Weymouth speed sailing championships the day after the 1987 'great storm'. I arrived at the week with a very under developed craft with a sort of square rig with poles attached to the foot. The sail moved forward during a shunt using the poles.The position the yard was attached to the halyard was also controllable during the shunt. The hull was asymmetric and steering by weight shift. The helm suspended from a trapeze.

The asymmetric hull's CLR was far to forward for the rig. Also I had great difficulty getting enough luff tension and considering the conditions overnight the sail was cut into a triangle. This was used as a jib with the tack hauled down to the the bow, shutting was by hauling the tack to the new bow. This was a very violent operation with a completely slack luff and storm force winds.

The craft was able to sail upwind in this configuration but failed to complete the speed sailing course, very good fun though. I was only a naive 23 at the time.

One interesting point about the craft was that it had a single beam connecting the hull and outrigger, the mast and stays holding it all together. Weight steering from a trapeze worked well.

However I learnt the hard way how far forward the CLR moves forward on an asymmetric hull and now favour symmetrical hulls and board style lateral resistance control for 'Western' rigs

Friday, 24 August 2012

Busy few weeks in the boat shed, garden gate seating platform all finished bar the painting. The mast partners made and dry assembled waiting coating. As detailed above the latest design for the board linear slider all dry fitted, waiting some epoxy work. Have changed to a rigid bar and bearings as it just simplified everything, made it more reliable and feels right.

Saturday, 4 August 2012

Have had the proa in the garden and experimented with the how and where I will sit. Tried the trampoline but far too flexible and uncomfortable. Tried just using beams but this would be too hard to move around. Finally as pictured two alloy tubes (never throw anything away have dragged these around with me since the 1980's) and a old but never used garden gate. Have purchased (£9.99) a folding hiking seat (blue thing) and this feels just right. Just sitting in the seat I get great vision of how it will all be completed and that the design is spot on.

Have also been sketching some ideas around improving the steering further and the idea off adding a tiller to steer - many ideas more to follow......

Sunday, 1 July 2012

Rubbing strip for leeboard. This is located on the leeward chine under water. The white strip is Acetal, very low friction and impossible to glue! see below 

Fixing on the impossible to glue Acetal. 50mm Kevlar tape was laminated to a glass table. When cured this was countersunk bolted to the Acetal witj the addition of 25mm penny washers. A pine reinforcement strip had previously been bonded to the hull. Using a Foursner bit this was counter bored  to take the nut and washer. The Acetal and Kevlar assembly will be bonded to the pine reinforcement. Very pleased with this solution to such a tricky problem but may still add some counter sunk screws. Obviously this would all be much easier if building from scratch and not modifying a existing craft.

Friday, 22 June 2012

Welcome to the Proasail Blog where you will find details of my experiments with small Proa sailing craft.
Left click on photos to enlarge 
this is the TP02 proa with centre wishbone boom mainsail and two counter rotating  rudders. It worked OK but due to the low freeboard I was unhappy with drag the rudder cassettes created.
Steering arrangement of TP02 

Construction details - hull is light and other than issues over the rudder attachments very strong 
Basic arrangement, a very simple construction foe ease of build and cost - it is a development project not a work or art - 'development boats should be disposable'
TP03 - the next design
This is the proposal for TP03. A simple lug rig with a single dagger board, steering is achieved by a combination of sail trim and daggerboard position. The intention is to have a simple, easy to rig robust touring proa rather than aim for all out speed. So far I have done a bit of hacking about as detailed below



holes cut in the deck to take two new mast sockets and old fittings removed
new bulkheads have been bonded in and reinforcements to take the mast foot added 
reinforcements for the leeboard strop and controls added
Strop testing


Strop fixing details


how the board will work

Lee board control - a work in progress